Real estate and construction

Protecting property rights and managing technical and contractual claims across real estate and construction projects.

Property, construction, and real rights

A property file connecting title, contract, and site reality

Real estate matters may combine ownership, usufruct, leases, easements, registration, development, and disposal restrictions. Construction disputes add scope, specifications, programmes, payment certificates, variations, handover, and defects. The analysis begins by identifying the right, its source, and the event affecting it.

We represent owners, developers, contractors, and beneficiaries in claims, settlement, and litigation. Technical and contractual documents are organized into a coherent legal record, identifying what requires expert evidence and what can be proved through documents, inspection, or calculations.

Property and project claims

The route changes with the right, parties, contract, and project stage.

Ownership and real rights

Ownership, usufruct, easement, partition, overlap, and rights derived from the property.

Lease and eviction

Rent, eviction, maintenance, damage, and interpretation of landlord and tenant duties.

Delay and variations

Causes of delay, extensions, changes, certificates, penalties, and additional cost.

Defects and handover

Proof of defects, responsibility, repair, damages, handover, and warranty obligations.

Connecting legal analysis to the technical issue

We organize the property or project record so every right and claim can be traced.

  1. 01

    Identify the right and contract

    We review title, registration, contract, and drawings and determine status and scope.

  2. 02

    Analyze event and loss

    We create an execution chronology and connect delay, defect, or obstruction to financial effect.

  3. 03

    Select the evidence route

    We identify expert needs, calculate the claim, and manage negotiation, litigation, and enforcement.

Connect the property right to the project’s technical reality

Title, boundaries, site conditions, contract, and programme should be read as one record.

Identify the source and extent of the right

We review title, usufruct, lease, maps, boundaries, restrictions, and connected agreements. This avoids a claim based on a general description of the property without identifying the right affected, the responsible party, and the act or obstruction said to have caused loss.

Build a project chronology

For construction disputes, programmes, instructions, variations, certificates, delays, handover, and defects are arranged over time. Each event is connected to responsibility and time and cost impact, separating concurrent delay and additional work from the original contractual scope.

Define the question for the expert

A request for a general report is rarely enough. We specify whether the issue is defect, progress, delay cause, repair cost, or specification compliance. A precise question makes expert work useful and connects technical conclusions to the legal remedy and calculation.

Manage a file combining contract, site, and calculation

The engagement starts by collecting title records, contracts, drawings, specifications, correspondence, photographs, reports, and certificates. They are organized by date and issue, and we identify any need for inspection, preservation of condition, engineering opinion, or valuation. Jurisdiction, dispute-resolution terms, notices, and contractual claim procedures are reviewed in parallel.

We distinguish repair cost, damages, unpaid amounts, penalties, and extensions and test claims for overlap. Negotiation and submissions use a schedule linking every remedy to its document and calculation, with the assessment updated if site conditions change or new work, reports, or payment data emerges.

If the project continues during the dispute, daily contract administration is separated from the legal position so notices, approvals, and reservations are made on time without unnecessary stoppage. The effect of any partial settlement, handover, or payment on remaining rights is reviewed before it is documented.

Core documents for review

Documents should be arranged chronologically and each claim linked to contractual and technical proof.

  • Title, usufruct, or lease document
  • Construction contract and specifications
  • Drawings and variation orders
  • Certificates and handover records
  • Technical reports, photographs, and correspondence

Real estate and construction: common questions

Forum and remedies differ with the right, contract, parties, and project stage.

What evidence demonstrates construction delay?

The approved programme, updates, change orders, site minutes, correspondence, extension requests, procurement records, and handover evidence are common sources. Each period must be analyzed for cause, impact, and responsibility rather than relying only on planned and actual completion dates.

Does every defect justify full replacement cost?

That depends on specifications, severity, repair feasibility, loss, and the proportionate remedy. A technical report commonly needs to explain cause, extent, repair method, and cost before those findings are tested against contractual responsibilities and warranties.

When is preservation of site condition useful?

It matters where the site may change, work may be removed, or later inspection could become impossible. Photographs, minutes, inspection, or expert evidence may preserve proof, but the appropriate method and timing depend on the dispute stage, forum, and asset.

Does handover prevent a later defects claim?

Not necessarily. The effect depends on the type of handover, reservations, defect, discoverability, warranties, and contract. We review the handover record, snag list, correspondence, and date of discovery and identify any notice requirement or continuing responsibility.

Discuss your Real estate and construction matter

Share the scope, parties, and current stage. Our team will review fit and the proposed route for handling it.